Chinook campground septic
Prepared for Brent Hackney | Brent Hackney Designs · Research checked 12 November 2026
Turn a campground plan into paid design work
Valley Ventures has conditional approval for a 22-site campground with two bathhouses and a new septic system. The county requires septic permits before construction -- a concrete need for site-specific wastewater design. Contact owner Allen Goulter directly to establish the current team and offer your commercial drainfield design and soil/layout assessment where work remains. [1, 2, 3, 4]
Valley Ventures | 720 Chinook Valley Road, Chinook, WA
Owner: Allen Goulter, applicant / property owner · Pacific County, Washington
PROJECT POSITION
Conditional use approved; septic permits required before construction. [2]
Why it fits
01 The approved proposal includes 22 sites, two bathhouses and septic service. Your commercial-system design range gives you a specific service to bring to the owner. [1, 2, 3]
02 The layout keeps development outside wetlands and buffers. Your soil/land-use and drainfield work can help shape a compliant design within that layout. [1, 4]
03 You publish statewide Washington service. Chinook is within that stated remit; agree site visits and scope directly with the owner. [4]
Your first move
Allen Goulter | Applicant / owner
Direct applicant email and phone published in the SEPA record. [1]
goulter4@gmail.com · 360-214-4817
Ask: Allen, who is handling the campground’s septic design now, what is the septic-permit stage, and is there remaining design or soil/layout work for us to scope and price?
From insight to action
Where your offer fits
Campground wastewater [1, 2]
Your contribution: Offer commercial septic design. [3]
Next step: Review the actual flow basis and appointed team.
Constrained site layout [1]
Your contribution: Assess soils and drainfield siting. [4]
Next step: Work within the approved development footprint.
Preconstruction permits [2]
Your contribution: Package the agreed design deliverables.
Next step: Confirm county requirements and price the remaining role.
This is a private owner-led design conversation, not a public bid. Agree your fee and deliverables with Allen after establishing the work he needs. [1, 2]
People to know
COUNTY PROJECT INTELLIGENCE
Zane Johnson, planner: zjohnson@co.pacific.wa.us / 360-642-9382 (county office). Decision and permit-record questions. [2]
EXISTING SITE INPUT
Critical Areas Consulting completed the revised wetland delineation. Coordinate with the existing team. [1]
What happens next
APPROVED -- JUNE DECISION
June 8 decision / June 10 letter records conditional approval following the May 26 hearing. [2]
NEXT -- OWNER’S CURRENT PLAN
Septic permits precede construction. Ask Allen for current permit/design status and his next purchasing decision. [2]
Evidence behind the opportunity
1. Ecology | Revised project | May 6
2. Pacific County | Decision | June 8-10
3. Brent Hackney | Design range | 12 Nov
4. Brent Hackney | Territory/services | 12 Nov
5. Pacific County | Notice index | 12 Nov
Open current program or procurement records
Public records checked 12 November 2026. Conditional use approval and septic construction permitting are separate steps.
Your next update
Confirm Allen’s current septic team and permit progress, then define any remaining design scope and proposal date.
CAL-VAL-BHD-001 · v1.0 · 12 November 2026
YOUR FIRST 3 REPORTS ARE FREE
Get 2 more reports. Free.
You already have this report. Request two more matched to your products and territory. No payment or subscription starts.
This report and two more company-specific reports are free. After your three free reports, further research is an optional paid subscription. Nothing starts automatically, and there is no obligation to subscribe.
Prefer to talk it through? A call is optional.
Keep the opportunities coming
If you want ongoing research, Caltrio helps you:
Find relevant projects
Research matched to your products and territory.
Know what to do next
Potential scope, relevant contacts and a useful first action.
Stay up to date
Weekly research updates and important changes to tracked projects.
Keep it in one place
Reports, PDF downloads, project tracking and research requests in your dashboard.

Dashboard example. Open full size →
30-day money-back guarantee
For any reason.
If you choose paid research, request a full refund within your first 30 days. No explanation required.
