Harco Street green streets
Prepared for Navy McKee | Kai Pono Solutions · Research checked 5 November 2026
An inlet-level fit worth qualifying
The County plans flow-based runoff treatment for 134 acres. Kai Pono’s shallow trash-capture systems could serve upstream of treatment facilities if the design permits. Start by establishing the current design lead and whether inlet-level supplier input is still useful—not by assuming an open equipment order. [1, 3]
Long Beach Island – Harco Street, et al. Green Streets
Owner: Los Angeles County Public Works · Unincorporated Los Angeles County, California
WHAT YOU COULD SELL
Trash-capture modules, application data and maintenance planning. [3]
CURRENT STAGE
Portal phase: Construction; actual design and buying stage need confirmation. [2]
NEXT MILESTONE
Construction forecast: March 2028. No supplier deadline verified. [2]
Why it fits
01 Kai Pono markets shallow, modular stormwater pretreatment. That makes inlet-level capture a plausible screening option for this flow-based project; inlet locations and available depth are not established. [1, 3]
02 California’s current certified list includes Kai Pono’s Standard Basic System. This supports a product-acceptance discussion; it does not establish County approval or suitability at Harco Street. [4]
03 Kai Pono presents accessible trash capture upstream of downstream treatment. Ask the designer whether that role is needed and how crews would access and maintain each unit. [3, 5]
Your first move
Jolene F. Guerrero’s Public Works office
Deputy Director’s office | Published routing contact, not a verified project buyer. [1, 6]
Ask: Who leads Harco Street’s design, is inlet-level trash pretreatment still open to supplier input, and what is the authorized purchasing route?
From insight to action
Where your offer fits
Runoff treatment [1]
Your contribution: Screen inlet-level trash-capture modules. [3]
Next step: Request drainage areas, inlet plans and the intended treatment train.
Product acceptance [4]
Your contribution: Provide the certified Standard Basic System’s design data.
Next step: Confirm design flow, bypass, head loss, depth and County acceptance.
Maintenance access [3]
Your contribution: Provide access and cleanout requirements.
Next step: Agree on debris loading, service access and the maintenance owner.
The portal estimates $9.7M for the whole project; no Kai Pono equipment allowance is established. It labels the phase Construction while forecasting a 2028 start—confirm actual status. [2]
People to know
PROJECT OWNER
Los Angeles County Public Works / Uninc. County. [1, 2]
DESIGN AND PURCHASING
Ask the routing office for the current designer and authorized buyer; neither is verified here.
What happens next
23 JANUARY 2026
County forecast design beginning in 2026; completion not verified. [1]
MARCH 2028 – NOVEMBER 2029
Portal construction forecast; estimated, not a bid window. [2]
Evidence behind the opportunity
1. County | Stormwater report | Jan 2026, p24
2. SCW | Live project schedule | checked 5 Nov
3. Kai Pono | Product | checked 5 Nov
4. State Water Board | Certified list | Aug, p8
5. Kai Pono | Applications | checked 5 Nov
6. County | Cluster agenda | Mar 2026, contact
Sources checked 5 November 2026. Supplier access is unconfirmed; no stakeholder was contacted.
Your next update
Check for design-lead confirmation, an inlet schedule or a supplier notice before preparing a project-specific quotation.
CAL-HARCO-KAI-001 · v1.0 · 5 November 2026
YOUR FIRST 3 REPORTS ARE FREE
Get 2 more reports. Free.
You already have this report. Request two more matched to your products and territory. No payment or subscription starts.
Keep the opportunities coming
If you want ongoing research, Caltrio helps you:
Find relevant projects
Research matched to your products and territory.
Know what to do next
Potential scope, relevant contacts and a useful first action.
Stay up to date
Weekly research updates and important changes to tracked projects.
Keep it in one place
Reports, PDF downloads, project tracking and research requests in your dashboard.

Dashboard example. Open full size →
30-day money-back guarantee
For any reason.
If you choose paid research, request a full refund within your first 30 days. No explanation required.