Canby’s new water supply

Prepared for Ken Navidi | Bainbridge Associates · Research checked 9 November 2026

A design-stage fit for your instrumentation

Canby is advancing a new river intake, pipeline and drinking-water plant. Bainbridge’s flow meters and water-quality analyzers could fit the emerging design. Staff plans a delivery-method recommendation in Q1 2027. The useful first move is to establish the authorized route for product input—not assume an equipment order is open. [1, 2, 4]

Canby Water Supply Program | Willamette River intake, pipeline and treatment plant

Owner: Canby Utility · Canby, Oregon

WHAT YOU COULD SELL

Closed-pipe flow meters and process water-quality analyzers. [4]

CURRENT STAGE

Year 2 design/permitting direction; delivery method under review. [1, 2]

NEXT MILESTONE

Q1 2027: staff targets a delivery-method recommendation, not an instrument bid. [2]

Why it fits

01 The new intake and pipeline are a plausible flow-meter application. Bainbridge lists McCrometer; check pipe size, operating range and accepted makes before choosing a model. [3, 4]

02 Bainbridge lists ECD chlorine, pH and turbidity instruments. Discuss the new plant’s monitoring needs; Canby’s instrument schedule and specified brands are not verified. [3, 4]

03 ECD’s roster assigns Oregon to Bainbridge and names Ken Navidi. This verifies the ECD route; check each other represented product line’s territory separately. [5]

Your first move

Canby Water Supply Program team
Owner’s published program contact | Ask to be routed to the instrumentation lead. [3]

CWSP@CanbyUtilityOR.gov · 503-266-1156

Ask: Who leads flow and analytical instrumentation for Year 2 design, and what is the permitted route for a representative to provide product data before procurement is fixed?

From insight to action

Where your offer fits

Intake and pipeline [3]

Your contribution: Screen suitable closed-pipe flow meters. [4]

Next step: Request flows, pipe sizes, installation limits and accepted manufacturers.

Drinking-water plant [3]

Your contribution: Screen process water-quality analyzers. [4]

Next step: Confirm measurement points, sample conditioning and acceptance criteria.

Design/procurement planning [2]

Your contribution: Offer application data through the owner’s approved channel.

Next step: Establish the instrument/controls lead, buying package and quotation route.

Design funding is reported, while the wider financing plan is still developing. No instrumentation allowance or supplier contract value is established. [1, 2]

People to know

OWNER / PROGRAM ROUTE
Kari Duncan, General Manager; use the program team above. [2, 3]

OWNER’S CONSULTANT
Eric Ward, Stantec Principal Project Manager; ask the program team for the technical route. [2]

What happens next

Q1 2027 — STAFF TARGET
Delivery-method recommendation; not an equipment tender. [2]

2027 — STAFF PLAN
Design or alternative-delivery RFP; instrument dates not published. [2]

Evidence behind the opportunity

1. Utility | Oct packet | Sep minutes, pp 4–7

2. Utility | Nov packet | Nov 2 memo, pp 15–16

3. Utility | Program and contact | checked 9 Nov

4. Bainbridge | Manufacturers | checked 9 Nov

5. ECD | Oregon representative | checked 9 Nov

6. Utility | Bid listing | checked 9 Nov

Open owner’s current project packet

Public records checked 9 November 2026. Supplier access is unconfirmed; no stakeholder was contacted.

Your next update

Watch the delivery-method decision and 2027 procurement notices; establish the instrumentation lead and accepted product-input route.

CAL-CWSP-BAI-001 · v1.0 · 9 November 2026

YOUR FIRST 3 REPORTS ARE FREE

Get 2 more reports. Free.

You already have this report. Request two more matched to your products and territory. No payment or subscription starts.

← Back

Thank you — your request has been received.

Your request for two free reports has been sent to Caltrio. No subscription or payment has started.

Prefer to talk it through? A call is optional.

Keep the opportunities coming

If you want ongoing research, Caltrio helps you:

Find relevant projects
Research matched to your products and territory.

Know what to do next
Potential scope, relevant contacts and a useful first action.

Stay up to date
Weekly research updates and important changes to tracked projects.

Keep it in one place
Reports, PDF downloads, project tracking and research requests in your dashboard.

Dashboard example with fictional reports, tracked projects and report requests

Dashboard example. Open full size →

30-day money-back guarantee

For any reason.

If you choose paid research, request a full refund within your first 30 days. No explanation required.