Dairy Acres Unit 2
Prepared for Frank Aguirre | Septic Systems Express · Research checked 14 November 2026
Get ahead of 30 future septic systems
Dairy Acres Unit 2's preliminary plat sets out 30 lots, all served by individual septic systems. An early relationship with the developer could put your evaluation and design services in front of buyers and builders as homes are planned. Contact Chris Damm about the Unit 2 septic-design route before individual appointments are made. [1, 2, 3]
30-lot expansion | Dairy Road | Leming, Atascosa County
Owner: TREF Land LLC · Atascosa County, Texas
CURRENT STAGE
Preliminary plat in Oct. 13 county packet; 30 OSSF lots. [1]
NEXT MILESTONE
Final-plat progress and individual design appointments; dates not published.
Why it fits
01 The lot-summary table allocates all 30 lots to individual septic systems, with no collective sewer. That matches your residential design and evaluation services. [1, 3]
02 The developer already markets Dairy Acres and works with homebuilders. Ask for the Unit 2 buyer and builder introduction route to develop repeat design commissions. [2]
03 The Leming location is in Atascosa, directly adjoining Bexar and included in your published service territory. The plat supplies water and floodplain details for your initial review. [1, 3]
Your first move
Chris Damm | Dairy Acres developer contact
Direct developer contact; confirm the Unit 2 septic-design route. [1, 2]
chrisdamm@hotmail.com · 210-687-5734
Ask: Chris, who will arrange individual septic evaluations and designs for Unit 2, and are buyers or builders still able to select their own provider?
From insight to action
Where your offer fits
30 OSSF lots [1]
Your contribution: Offer lot-specific evaluation and septic design. [3]
Next step: Establish whether a provider is committed across Unit 2.
Future home layouts
Your contribution: Plan septic space before home placement.
Next step: Request the Unit 2 plat and build timing.
Floodplain lots [1]
Your contribution: Review disposal layout against lot constraints.
Next step: Review mapped floodplain on lots 56-63.
Water: McCoy WSC. The preliminary plat flags lots 56-63 for mapped floodplain involvement. Review current lot conditions and permits before scoping a design. This is private developer / buyer work, not an open county tender. [1]
People to know
SECOND DEVELOPER CONTACT
Josh Damm: josh_damm@hotmail.com | 210-878-7364. Buyer / builder introductions. [2]
APPOINTED CIVIL FIRM
Rakowitz Engineering and Surveying: 830-281-4060. Named civil firm; individual septic allocation to establish. [1]
What happens next
OCTOBER 13 — PLAT PACKET
County packet presents preliminary Unit 2 plat with lots 40-69. [1]
NEXT — DEVELOPER DISCUSSION
Confirm current final-plat progress, buyer timing and individual design route. No appointment deadline published.
Evidence behind the opportunity
1. Atascosa | Oct. 13 packet | p37
2. Dairy Acres | Developer contacts
3. TOWA | Your residential services
Open county plat and supporting packet
Public records checked 14 November 2026. Latest verified Unit 2 stage is preliminary plat; provider availability is unconfirmed.
Your next update
Check Unit 2 final-plat progress and who commissions septic designs, then agree a developer or builder referral route.
CAL-DA2-SSE-003 · v1.0 · 14 November 2026
YOUR NEXT STEP WITH CALTRIO
Build your local project pipeline.
These two reports complete your free samples. Tell us which services and counties to prioritize for an ongoing research subscription. No payment or subscription starts from this form.
These two follow-up reports complete your three free reports. Further tailored research is an optional paid subscription. Tell us what would make it useful; nothing starts automatically.
Prefer to talk it through? A call is optional.
Keep the opportunities coming
If you want ongoing research, Caltrio helps you:
Find relevant projects
Research matched to your products and territory.
Know what to do next
Potential scope, relevant contacts and a useful first action.
Stay up to date
Weekly research updates and important changes to tracked projects.
Keep it in one place
Reports, PDF downloads, project tracking and research requests in your dashboard.

Dashboard example. Open full size →
30-day money-back guarantee
For any reason.
If you choose paid research, request a full refund within your first 30 days. No explanation required.
